How Long Does a 5x8 Bathroom Remodel Take? A Comprehensive Guide

Are you planning to remodel your 5x8 bathroom and wondering how long the process might take? Look no further! In this guide, we will provide you with all the necessary information about the time frame for a 5x8 bathroom remodel. Whether you're a homeowner or a contractor, understanding the duration of the project will help you better plan and manage your resources.

  1. Factors Affecting the Duration of a 5x8 Bathroom Remodel:
  • Scope of work: The complexity and extent of the remodel will play a significant role in determining the time required.
  • Structural changes: If you plan to modify the layout or make structural changes, it may extend the project duration.
  • Material selection: The time needed to source and acquire materials can impact the overall timeline.
  • Contractor availability: The availability and schedule of the contractor you choose will also influence the duration.
  1. Average Time Frame for a 5x8 Bathroom Remodel:

    While every project is unique, a typical 5x8 bathroom remodel can take anywhere between two to four weeks. However, keep in mind that unexpected issues or delays may arise during the process, which could extend the timeline

If you are planning on doing a small bathroom remodel, one of the first questions you will think of is “How long does it take to remodel a small bathroom?” Small bathroom remodeling can take anywhere from three days, up to two months.

Table of Contents

Can you renovate a bathroom in 2 weeks?

According to the Housing Industry Association, it takes up to 25 days (on average) to complete a full bathroom installation as part of a renovation. It's worth noting those days may not be consecutive, there could be a day or two where no one is on site. For example, waiting on waterproofing to set etc.

How long does it take to renovate a bathroom by yourself?

While there's no telling what you might find while ripping out old tile, a little planning is all you need to confidently DIY your bathroom repair. It typically takes between two and three months to remodel a bathroom.

How long does a full bathroom install take?

However, even then, it can sometimes take weeks or even months to get everyone lined up and ready to start work. Once the project finally gets underway, most bathroom remodelling projects take between one and two weeks to complete. However, this can vary depending on the size and scope of the project.

Can you remodel a bathroom in a week?

Doing a one week bathroom remodel is a possibility if you put in the effort and have the skills and tools to get it done. A quick bathroom remodel means less time without a bathroom and less time with the noise and inconvenience of a construction project.

In what order should you renovate a bathroom?

The usual bathroom installation stages are:

  1. First fix. The first fix consists of any plumbing and electrical requirements.
  2. Wall coverings. Walls are covered with your choice of tile or wall boards.
  3. Floor coverings.
  4. Sanitary ware and furniture installation.
  5. Finishing touches.

Should I replace my toilet during a remodel?

Replacing the flooring: If you plan to replace your bathroom's flooring during a remodel, consider replacing the toilet. In many cases, the existing unit will have to be temporarily uninstalled to make way for the new flooring, so it may be an ideal time to upgrade to a new unit.

Frequently Asked Questions

How many days should it take to remodel a bathroom?

On average, a small complete bathroom remodel can be done in about 23 days under ideal circ*mstances. Assuming that no work is done on weekends, this translates to about 4 1/2 weeks—slightly more than one month—if the work proceeds uniformly with no breaks.

How many days does it take to remodel a shower?

However, if there are other things you want to be done, like re-tiling or installing another handheld showerhead, then expect the process to last longer. Conversely, if you undertake a budget shower remodel, then it'll take around 23 days to complete this project.

Can you remodel a bathroom in a weekend?

Give your bathroom a dramatic makeover in one long weekend by replacing the vanity cabinet, sink and faucets. Changing a vanity is relatively easy. All you need are basic carpentry and plumbing skills. And if you paint the walls at the same time, you can achieve a stunning transformation.

How long should it take to remodel a master bathroom?

Four to six weeks

On average, a master bathroom remodel can take anywhere from four to six weeks. Despite this average timeline, the real time to remodel a bathroom depends on several factors. That being said, the average schedule will give you a good idea about what you can expect.

How long does it take to rip out and replace a bathroom?

Replacing sanitaryware, tiles and paint – 3-4 weeks

If you're after a new look and style for the smallest room in the house and want to install new bathroom features, here's what to allow for: Removing the sink, loo, shower/bath and tiles - 1 week. Installation of new pipes - 2-3 days. First-fix electrics - 3-4 days.

How many weeks does it take to renovate a bathroom?

From the first day of demolition to the final walk-through, your bathroom renovation could take a bit less — or substantially more — time than average. Some bathrooms may take as little as 3-4 weeks to finish, while others take 9-10 weeks, or even longer.

How long does it take to demolition a bathroom?

One to two days

Demolition: One to two days

Cosmetic demolition simply removes elements such as an old vanity or toilet, which should only take a few hours. Full demolition, such as removing bathtubs and surrounding walls, will need roughly a day-2 day to complete.

FAQ

How long does it take to gut and remodel a small bathroom?

If you are planning on doing a small bathroom remodel, one of the first questions you will think of is “How long does it take to remodel a small bathroom?” Small bathroom remodeling can take anywhere from three days, up to two months.

How much does it cost to rip out and replace a bathroom?

A new bathroom can cost as little as £3,000 or as much as £15,000. On average, you can expect to pay about £6,000-8,000. The cost of a bathroom installation can vary significantly depending on several factors.

How many quotes should I get for bathroom remodel?

A recent Modernize survey showed that 63 percent of homeowners compare three to four contractor estimates ahead of a home improvement project. Evaluating multiple bathroom remodel quotes helps homeowners better understand their budget while also encouraging contractors to be competitive with their pricing.

In what order do you remodel a bathroom?
How to Remodel a Bathroom in 7 Steps
  1. Remove Bathroom Fixtures.
  2. Install the New Shower or Tub.
  3. Lay the New Flooring.
  4. Hang Drywall and Start Painting.
  5. Install Cabinets and Vanity.
  6. Update Lighting.
  7. Hook Up the Plumbing.
What is the most expensive part of a bathroom remodel?

When it comes to remodeling, the highest single cost is labor, which usually accounts for 20%–65% of the final cost. However, if you're looking at the tangible items within a bathroom, the wet area (tub, shower, and wall surrounds) is the most expensive part.

How long does small bathroom remodel take

Sep 11, 2022 — Depending on the nature of the remodel, the work can take as little as a few days or as much as many months. Are you doing the work yourself or

How long does a 5x8 bathroom remodel take

What comes first in bathroom remodeling?

1. Remove Bathroom Fixtures. Assuming you're partially or totally renovating your bathroom, you'll need to start by removing drywall and any fixtures you're replacing. Gutting the bathroom yourself isn't too difficult, but make sure to follow these steps to avoid any costly mistakes during the demolition phase.

What's the average time it takes to remodel a bathroom?

On average, a small complete bathroom remodel can be done in about 23 days under ideal circ*mstances. Assuming that no work is done on weekends, this translates to about 4 1/2 weeks—slightly more than one month—if the work proceeds uniformly with no breaks.

When remodeling a bathroom do you do the floor first?

Why You Should Tile the Floor First. The tile installation principle is that the tiled wall 'hangs' over the tiled floor. The best way to achieve this outcome is by first tiling the floor so that the wall tile will then seem to be 'sitting' on the bathroom floor.

What is the average cost to install a full bathroom?

Our recommended installers quoted a range of £160 to £210 for small jobs like fitting a pedestal basin with taps, while larger tasks such as tiling a bathroom came in with an average fee of around £100–£120 per square metre. Overall, the average cost of installing a new bathroom in the UK is £7,200.

How long should a tile shower remodel take?

Tiling Preparation and Installation: Seven days or more

A professional installation could take from one to two days to prep walls plus another five days for floor-to-ceiling tiling on a shower stall if your remodeler is devoted to your job full-time.

How often should you redo your shower?

If you ask an interior designer how often you should redo your bathroom, they will answer every five years. If you ask a realtor, they suggest 10 as a good number. When you look at the advertised longevity of most sinks, toilets, and showers–the number extends up to 20 and beyond.

  • How long does it take to remove and retile a shower?
    • Typically, you can expect to spend around three to four full days tiling a shower that has a tub and closer to a full week for larger spaces that require tiling the shower floor. This can go faster if you work with a friend and don't move any structural or plumbing components.

  • Why is shower remodel so expensive?
    • Professional Bathroom Remodel

      The trade-off is the cost of labor. Around 60% to 70% of bathroom renovation costs go to labor. Demolition or time-consuming work such as retiling a bathroom floor or shower increases cost the most. You'll also need to deal with contractors coming in and out of your home for several weeks.

  • How long does it take to rip out and install new bathroom?
    • Replacing sanitaryware, tiles and paint – 3-4 weeks

      If you're after a new look and style for the smallest room in the house and want to install new bathroom features, here's what to allow for: Removing the sink, loo, shower/bath and tiles - 1 week. Installation of new pipes - 2-3 days. First-fix electrics - 3-4 days.

  • How long does it take to install a small bathroom?
    • Bathroom installations usually take between one and four days, depending on the size and complexity of the project. However, if there are any problems or delays, it could take longer. Once the job is finished, you'll be able to enjoy your brand new bathroom!

  • How long should it take to remodel a bathroom?
    • Possible timeframe for a full bathroom renovation

      Some bathrooms may take as little as 3-4 weeks to finish, while others take 9-10 weeks, or even longer.

  • What percentage of bathroom remodel should be labor?
    • 40% to 65%

      Although they are only sometimes included in your total bid, contractor and labor costs are essential factors to consider for your bathroom remodel project. Labor typically comes to 40% to 65% of your total remodeling budget or $50 to $75 per hour.

How Long Does a 5x8 Bathroom Remodel Take? A Comprehensive Guide - First Floor Remodeling (2024)
Top Articles
Latest Posts
Article information

Author: Gov. Deandrea McKenzie

Last Updated:

Views: 6205

Rating: 4.6 / 5 (66 voted)

Reviews: 89% of readers found this page helpful

Author information

Name: Gov. Deandrea McKenzie

Birthday: 2001-01-17

Address: Suite 769 2454 Marsha Coves, Debbieton, MS 95002

Phone: +813077629322

Job: Real-Estate Executive

Hobby: Archery, Metal detecting, Kitesurfing, Genealogy, Kitesurfing, Calligraphy, Roller skating

Introduction: My name is Gov. Deandrea McKenzie, I am a spotless, clean, glamorous, sparkling, adventurous, nice, brainy person who loves writing and wants to share my knowledge and understanding with you.